Project Description
From the news of CHEC Jazan Integrated Gasification Combined Cycle Project water intake and outlet project Saudi Arabia, the last part HDPE pipeline was jointed underwater successfully with the help of mono buoyancy units. It marks the success of the installation of the world’s longest and most flexible pipeline.
HDPE pipeline installation is the biggest risk point of whole project. Because it is the first world’s largest diameter and longest pipeline project. And it is constructed under harsh environment of Red Sea. The CHEC engineering team optimizes the design and construction program. With the help the DOOWIN vertical buoyancy bags, the installation was started from pelagic widdershins. The CHEC team overcomes the technology difficulties under theoretical discussions, experimental sand table simulations and experience discussions and other technical and feasibility studies.
For the successful installation of the HDPE pipeline, the CHEC team has been highly praised by Saudi Aramco. DOOWIN pipeline mono buoyancy units are highly praised by CHEC project team too.